Posted on

19 Hillard Street Condo

Tags Commercial

The project involved the heavy prep and re-painting of the entire building in the same historical navy blue.

Last Updated: November 10, 2026

Condo Painting Project Case Study in Cambridge, MA

19 Hillard Street Condo

Condo Painting Project Case Study

PROJECT INVOLVEMENT
This historic building was a block from Harvard Square. It was an old property in tough condition that had
been converted to condos years back. The siding had massive fading and the old trims were peeling and
cracking significantly. The property also had many old windows with failed glazing.

The project involved the heavy prep and re-painting of the entire building in the same historical navy blue.

CHALLENGES:
We had to work along side carpenters, which was achieved through ongoing communication from both
companies. We also had a busy sidewalk on the left side of the property that had to be sectioned off in
order to work on that part of the structure. Lastly, the property abutted another housing facility behind and
we had to be mindful of their landscape and space.

PROJECT TIMELINE
Starting in August 2024, the project was completed in 2 weeks.

THE FINAL RESULTS
A fresh blue color for the historic building.

Condo Painting Project Photos

Before

After

Contact us today for your free estimate

See how our skilled professional painters at CertaPro Painters® of Needham, MA can create a beautiful, lasting transformation for your residential or commercial property.

Schedule a Free Estimate

Commercial painting portfolio

View some of the other commercial painting work CertaPro Painters® of Needham, MA has performed in your area.

See all

Needham, MA

  • Commercial

19 Hillard Street Condo Painting Case Study

The project involved the heavy prep and re-painting of the entire building in the same historical navy blue.

Read the Case Study
This historic building is located about a block from Harvard Square.
The old property was in tough condition, leading to it being turned into condos a few years back.
The siding suffered from fading, peeling, and significant cracking.
In collaboration with side carpenters, our team was able to revitalize the building.
After two weeks, the building's beautiful blue color was shining again.

1 of 5