Our team was hired to waterproof the split-face block exterior of a church and to paint its two connecting daycare buildings that were aluminum sided. We also painted 18 interior and exterior metal doors.

Last Updated: November 10, 2026

Church Exterior Case Study in West Roxbury, MA

Annunciation Church

Church Painting Case Study

PROJECT INVOLVEMENT

Our team was hired to waterproof the split-face block exterior of a church and to paint its two connecting daycare buildings that were aluminum sided. We also painted 18 interior and exterior metal doors.

This project required extensive prep work on the exterior doors that suffered from major rust issues. We made sure to use the right primer to seal the rust and an industrial metal enamel to protect it from the elements.

Prior to painting the daycare building, we applied an industrial-grade direct-to-metal product to achieve a large color change and to protect the substrate. We also applied a specialized water sealer called Conflex Siloxane which was highly recommended by Sherwin Williams.

CHALLENGES:

This project required us to work around church personnel. When it came to painting the daycare we were able to work around recess and pick up time for the children through ongoing communication with the facility manager.

PROJECT TIMELINE
We completed the project in 1 week.

THE FINAL RESULTS
The client loved the refreshed exterior that is sure to last for years to come!

Annunciation Church Painting Project Photos

Contact us today for your free estimate

See how our skilled professional painters at CertaPro Painters® of Needham, MA can create a beautiful, lasting transformation for your residential or commercial property.

Schedule a Free Estimate

Commercial painting portfolio

View some of the other commercial painting work CertaPro Painters® of Needham, MA has performed in your area.

See all

Needham, MA

  • Commercial

Annunciation Church

Our team was hired to waterproof the split-face block exterior of a church and to paint its two connecting daycare buildings that were aluminum sided. We also painted 18 interior and exterior metal doors.

Read the Case Study
Our team was hired to waterproof the split-face block exterior of a church
We also painted its two connecting daycare buildings that were aluminum sided.
18 interior and exterior metal doors were also painted.
This project required extensive prep work on the exterior doors that suffered from major rust issues.
We made sure to use the right primer to seal the rust and an industrial metal enable to protect it from the elements.
We completed the project in 1 week and worked around the daily activities of church personnel and pick up time at the daycare.
The client loved the refreshed exterior that is sure to last for years to come!